Saturday, July 25, 2009

day 1

Saturday the 25th, I purchased materials:
  • concrete board and green board
  • conduit, connectors, boxes, gfci outlet, gfci outlet w/switch, exhaust fan
  • shower fixture, new drain and overflow kit
  • glass block window bits
  • more little bits I can't remember at the moment
I took a page from my father's book, I deliberately bought more than I think I needed. For example with generous estimates I am going to be using less than 8 10' pieces of conduit, and the only reason I am using so many pieces is because there are several runs > 6'. I bought 10 pieces of conduit, just in case. So now the worst case scenario is that I have to take the extra materials back. This is preferable to finding out in the middle of doing some work that I am short 1 or 2 items.

I also did the pre-demolition. Removing towel bars, shelves, etc and the pedestal sink.